Risk Analysis and Reducing Measures in the Tunneling Project of Tabriz Metro Line 2

Document Type : Research Article

Authors

1 Dept. of Mining Engineering, Sahand University of Technology, Tabriz, Iran

2 Tabriz Metro Line 2, Tabriz, Iran

Abstract

Risk management and control are essential tools in various engineering fields, particularly in tunneling projects, which are inherently associated with a high degree of uncertainty and risk. Due to these uncertainties, risk management plays a crucial role in such projects. Given the complexity of tunneling, especially in urban environments, it is vital to identify, evaluate, and analyze risks throughout the project lifecycle. This study examines the geotechnical conditions of Tabriz Metro Line 2, taking into account factors such as the tunnel boring machine (TBM), support structures, and human resources. The risks along the project route have been identified, prioritized, and mitigation strategies have been proposed to reduce these risks. The risks in the Tabriz Metro Line 2 project were categorized into six main groups: geotechnical hazards, excavation machinery, construction period, support and human resources, design and research phase, and management. Each category’s hazards were identified, evaluated, and key influencing factors were analyzed. Based on the risk analysis results, the risks were classified into high, medium, and low categories, and appropriate mitigation measures were suggested for each level of risk. Through the implementation of effective risk response techniques, high-risk hazards were reduced by 39%, and medium-risk hazards were reduced by 23%. This research provides valuable insights that can improve the overall quality and efficiency of the Tabriz Metro Line 2 tunneling project.

Keywords

Main Subjects


[1]       Ehrbar, H., & Kellenberger, J. (2003, September). Risk management during the construction of the Gotthard base tunnel. In Proc. International Symposium on Geotechnical Measurements and Modellings, Karlsruhe.
[2]        Moergeli, A. (2004). Risk Management in Tunneling–Occupational Safety+ Health Plans for Drill & Blast and Tunnel Boring Machines. In Proc. of the North American Tunneling Conference (pp. 153-163).
[3]        Schmitt, D. (2007, July). Construction and planning of the Kallidromo tunnel on the NCL Athens-Thessaloniki. In ISRM Congress (pp. ISRM-11CONGRESS). ISRM.
[4]        KIM, Y. G. (2009). Application of risk analysis and assessment in tunnel design. International Journal of the JCRM, 5(1), 11-18.
[5]        Emadi, S.M., Talebinezhad, A., Gharabaghi, M., Parvaresh, A., Asadi, A., Naeimi, S.T. (2010). Evaluation of geotechnical hazards in full-section excavation with a tunnel boring machine (TBM) of subway tunnels (case study: Project of Tehran metro line 7). International Mining Congress, Tehran.
[6]        Sayadi, A.R., Hayaty, M., Azar, A. (2011). Assessment and Ranking of Risks in Tunneling Projects Using Linear Assignment Technique. International Journal of Industrial Engineering & Production Research (In Persian). 22(1), 28-38.
[7]        Ehrbar, H., & Lieb, R.H. (2011). Gotthard Base Tunnel Risk Management for the World's Longest Railway Tunnel: Lessons Learnt. In Proceedings of the 37th ITA-AITES World Tunnel Congress.
[8]        Song, T. T., & Wang, C. H. (2011). The Practice of Risk Identification and Assessment of EPB Tunnel in Mixed Face Ground. Applied Mechanics and Materials, 94, 1196-1200.
[9]        Likhitruangsilp, V., & Ioannou, P. G. (2012). Analysis of risk-response measures for tunneling projects. In Construction Research Congress 2012: Construction Challenges in a Flat World (pp. 258-267).
[10]     Chung, H., Lee, I. M., Jung, J. H., & Park, J. (2019). Bayesian networks-based shield TBM risk management system: methodology development and application. KSCE Journal of Civil Engineering, 23, 452-465.
[11]     Wagh, S. S., & Potnis, S. (2021). Risk Assessment of Pune Metro Underground Construction Using Risk Matrix and Expected Monitory Value. In Advances in Water Resources and Transportation Engineering: Select Proceedings of TRACE 2020 (pp. 43-55). Springer Singapore.
[12]     Li, K., Xiahou, X., Huang, H., Tang, L., Huang, J., Li, Q., & Feng, P. (2022). Ahp-fse-based risk assessment and mitigation for slurry balancing shield tunnel construction. Journal of Environmental and Public Health.
[13]     Koohathongsumrit, N., & Meethom, W. (2024). Risk analysis in underground tunnel construction with tunnel boring machines using the Best–Worst method and data envelopment analysis. Heliyon, 10(1).
[14]     PMBOK® Guide-Seventh Edition (2023) PMBOK® Guide-Seventh Edition. Project Management Institute, Newtown Square.
[15]     Geotechnical risks evaluation report of Tabriz metro line 2. (2021). Tabriz Urban Railway Organization.