[1] Ehrbar, H., & Kellenberger, J. (2003, September). Risk management during the construction of the Gotthard base tunnel. In Proc. International Symposium on Geotechnical Measurements and Modellings, Karlsruhe.
[2] Moergeli, A. (2004). Risk Management in Tunneling–Occupational Safety+ Health Plans for Drill & Blast and Tunnel Boring Machines. In Proc. of the North American Tunneling Conference (pp. 153-163).
[3] Schmitt, D. (2007, July). Construction and planning of the Kallidromo tunnel on the NCL Athens-Thessaloniki. In ISRM Congress (pp. ISRM-11CONGRESS). ISRM.
[4] KIM, Y. G. (2009). Application of risk analysis and assessment in tunnel design. International Journal of the JCRM, 5(1), 11-18.
[5] Emadi, S.M., Talebinezhad, A., Gharabaghi, M., Parvaresh, A., Asadi, A., Naeimi, S.T. (2010). Evaluation of geotechnical hazards in full-section excavation with a tunnel boring machine (TBM) of subway tunnels (case study: Project of Tehran metro line 7). International Mining Congress, Tehran.
[6] Sayadi, A.R., Hayaty, M., Azar, A. (2011). Assessment and Ranking of Risks in Tunneling Projects Using Linear Assignment Technique. International Journal of Industrial Engineering & Production Research (In Persian). 22(1), 28-38.
[7] Ehrbar, H., & Lieb, R.H. (2011). Gotthard Base Tunnel Risk Management for the World's Longest Railway Tunnel: Lessons Learnt. In Proceedings of the 37th ITA-AITES World Tunnel Congress.
[8] Song, T. T., & Wang, C. H. (2011). The Practice of Risk Identification and Assessment of EPB Tunnel in Mixed Face Ground. Applied Mechanics and Materials, 94, 1196-1200.
[9] Likhitruangsilp, V., & Ioannou, P. G. (2012). Analysis of risk-response measures for tunneling projects. In Construction Research Congress 2012: Construction Challenges in a Flat World (pp. 258-267).
[10] Chung, H., Lee, I. M., Jung, J. H., & Park, J. (2019). Bayesian networks-based shield TBM risk management system: methodology development and application. KSCE Journal of Civil Engineering, 23, 452-465.
[11] Wagh, S. S., & Potnis, S. (2021). Risk Assessment of Pune Metro Underground Construction Using Risk Matrix and Expected Monitory Value. In Advances in Water Resources and Transportation Engineering: Select Proceedings of TRACE 2020 (pp. 43-55). Springer Singapore.
[12] Li, K., Xiahou, X., Huang, H., Tang, L., Huang, J., Li, Q., & Feng, P. (2022). Ahp-fse-based risk assessment and mitigation for slurry balancing shield tunnel construction. Journal of Environmental and Public Health.
[13] Koohathongsumrit, N., & Meethom, W. (2024). Risk analysis in underground tunnel construction with tunnel boring machines using the Best–Worst method and data envelopment analysis. Heliyon, 10(1).
[14] PMBOK® Guide-Seventh Edition (2023) PMBOK® Guide-Seventh Edition. Project Management Institute, Newtown Square.
[15] Geotechnical risks evaluation report of Tabriz metro line 2. (2021). Tabriz Urban Railway Organization.