[1] Sarı, M. (2002), Risk assessment approach on underground coal mine safety analysis, (Doctoral dissertation, Middle East Technical University, Department of Mining Engineering.
[2] Joy, J. (2004), Occupational safety risk management in Australian mining, Occup, Med. (Chic. Ill), vol. 54, no. 5, pp. 311–315.
[3] Duzgun, H. S. B. and Einstein, H. H. (2004), Assessment and management of roof fall risks in underground coal mines, Saf. Sci., vol. 42, no. 1, pp. 23–41.
[4] Palei, S. K. and Das, S. K. (2009), Logistic regression model for prediction of roof fall risks in bord and pillar workings in coal mines: an approach, Saf. Sci., vol. 47, no. 1, pp. 88–96.
[5] Khanzode, V. V., Maiti, J. and Ray, P. K (2011), A methodology for evaluation and monitoring of recurring hazards in underground coal mining, Saf. Sci., vol. 49, no. 8, pp. 1172–1179.
[6] Jiang,Y., Wang, H., Xue, S., Zhao, Y., Zhu, J and X. Pang (2012), Assessment and mitigation of coal bump risk during extraction of an island longwall panel, Int. J. Coal Geol., vol. 95, pp. 20–33.
[7] Ghasemi, E., Shahriar, K and Sharifzadeh, M. (2010), A new method for risk assessment of pillar recovery operation, Saf. Sci., vol. 48, no. 10, pp. 1304–1312.
[8] Badri, A., Nadeau, S and Gbodossou, A (2013), A new practical approach to risk management for underground mining project in Quebec, J. Loss Prev. Process Ind., vol. 26, no. 6, pp. 1145–1158.
[9] Eratak, O. D (2014), Analysis and Modelling for Risk Management for Underground Coal Mines Safety, Middle East Technical University.
[10] Mark, C. and Gauna, M (2016), Evaluating the risk of coal bursts in underground coal mines, Int. J. Min. Sci. Technol., vol. 26, no. 1, pp. 47–52.
[11] Krause, E., Krzemien, A and Smolinski, A (2015), Analysis and assessment of a critical event during an underground coal gasification experiment, J. Loss Prev. Process Ind., vol. 33, pp. 173–182.
[12] Zadeh, L. A (1965) ,Fuzzy sets, Inf. Control, vol. 8, no. 3, pp. 338–353.
[13] Hwang, C. L and Yoon, K (2012), Multiple attribute decision making: methods and applications a state-of-the-art survey , vol. 186. Springer Science & Business Media.
[14] Zimmermann, H. J (2011), Fuzzy set theory and its applications, Springer Science & Business Media.
[15] Dubois, D. J (1980), Fuzzy sets and systems: theory and applications, vol. 144, Academic press.
[16] Chen, T. Y. and Tsao, C. Y (2008), The interval-valued fuzzy TOPSIS method and experimental analysis, Fuzzy Sets Syst., vol. 159, no. 11, pp. 1410–1428.
[17] Ashtiani, B., Haghighirad, F. Makui, A. Makui, and Montazer, G. ali (2009), Extension of fuzzy TOPSIS method based on interval-valued fuzzy sets, Appl. Soft Comput., vol. 9, no. 2, pp. 457–461.
[18] Ataei. M, (2010), Fuzzy multi criteria decision making, Shahrood University of Technology, (in Persian).
[19] Technical office of Tabas coal mine (1996), Geology report of Tabas coalfield, (in Persian).
[20] Sun, L (2004), A Guide to the Project Management Body of Knowledge, (PMBOK Guide), Project Management Institute, Incorporated.
[21] Hebblewhite, B. K (2007), Management of geotechnical risks in mining projects, Sch. Min. Eng. Univiversity of New South Wales, Sydney NSW, Aust.