[1] Cooper, M. L., Chapman, D. N., Rogers, C. D. F. & Chan, A. H. C. (2002). Movements in the Piccadilly Line tunnels due to the Heathrow Express construction. Geotechnique 52, No. 4, 243–257.
[2] Liao, S. M., Liu, J. H., Wang, R. L. & Li, Z. M. (2009). Shield tunneling and environment protection in Shanghai soft ground. Tunnelling and Underground Space Technology 24, pp.454-465.
[3] Kim, S.H. (1996). Model testing and analysis of interactions between tunnels in clay. PhD thesis,Department of Engineering Science, University of Oxford.
[4] Lim, S. (2012). Three dimensional centrifuge and numerical modeling on effects of construction sequences on perpendicularly crossing tunnels. Phd thesis. Department of Civil and Environmental Engineering, Hong Kong University of Science and Technology.
[5] Liu, H. Y., Small, J. C., Carter, J. P. & Williams, D. J. (2009). Effects of tunnelling on existing support systems of perpendicularly crossing tunnels. Computers and Geotechnics 36, No. 5,pp. 880-894.
[6] Li, P., Du, S. (2012). Responses of Cross-River Tunnel due to Overlying Shield Tunnel Construction (Ⅰ): Influence of Construction Procedure. ICPTT 2012: pp. 1585- 1594.
[7] Razi, A.M. and Shahriar, K. (2014). Numerical modeling of two tunnels cross-cut using FLAC3D software, Case Study: line 6 and 7 of Tehran Metro. 10th national conference tunnel. Tehran, Iran. (in Persian)
[8] Maadikhah, A. and Zare, Sh. (2012). The investigation into the effect of tunnel excavation of Tehran metro line 7 on East sewage tunnel. 9th national conference tunnel, Tehran, Iran.
[9] Chakeri, H., Hasanpour, R., Mehmet, A. H., Bahtiyar, U. (2011). Analysis of interaction between tunnels in soft ground by 3D numerical modeling. Bull Eng Geol Environ, page 439–448. (in Persian)
[10] Sahel Consultant Engineers. (2009). The report of geometric design of the east-west lot of Tehran metro line 7. Tehran. (in Persian)
[11] Khakrizab Engineering Co. (2009). The report of implementation method-engineering services of auxiliary tunnel of Abuzar channel. Tehran. (in Persian)
[12] Sahel Consultant Engineers. (2010). The report of Geological Engineering and Geotechnics of the east-west lot of Tehran metro line 7. Tehran. (in Persian)
[13] Federal Highway Administration. (2009). Technical Manual for Design and Construction of Road Tunnels. FHWA-NHI-09-01. U.S.
[14] American Concrete Institute (ACI). (1999). Mannual of Concrete Practice (MCP).
[15] Japan Society of Civil Engineers (JSCE). (2006). Standard specifications for tunneling.
[16] V. Guglielmetti,P. Grasso, A. Mahtab and S. Xu. (2007). Mechanized Tunnelling in Urban Area, published by Taylor and Francis Group.
[17] O.Y. Ezzeldine, A.A. Darrag. (2006). Instrumentation at the CWO Crossing – El Azhar Road Tunnels and its use in the Design of Future Projects. Utilitization of underground space in urban areas International Symposium, Egept.