[1] Mohammad, Ataei. (2005). Underground Mining Vol. (1), Shahrood University of Technology Publications.
[2] Sens, J., & Topal, E. (2009). A new algorithm for stope boundary optimisation. Proceedings of New Leaders 2009. Australasian Institute of Mining and Metallurgy, 25-28.
[3] GAMS Development Corporation, (2017). Washington DC, USA, available at
www.gams.com
[4] Jalali, S.E, (2006). Optimization of Underground Mines Limits in Vein Type deposits, PhD Thesis, Amirkabir University of Technology, Iran.
[5] Riddle, J. M. (1977). A dynamic programming solution of a block-caving mine layout. In Proceeding of the 14th International Symposium on Application of Computers and Operations Research in the Minerals Industries. Society for Mining, Metallurgy and Exploration (pp. 767-780).
[6] Ovanic, J., & Young, D. S. (1999). Economic optimisation of open stope geometry .Paper presented at the 28th International APCOM Symposium, Colorado School of Mines, Golden.
[7] Jalali, S.E, Ataee-pour, M, & Shahriar, K, (2007). Rigorous Algorithms to Optimise Stope Boundaries; Capabilities, Restrictions and Applications’, Modern Management of Mine Producing, Geology and Environmental Protection, Albena, Bulgaria.
[8] Jalali, S.E, Ataee-pour, M, Shahriyar, K, & Elahi-Zeyni, E, (2007). A Computer Program to Optimize Stope Boundaries Using Probable Stope Algorithm’, Iranian Journal of Mining Engineering (IRJME), 2(3), pp.7–14.
[9] Grieco, N., & Dimitrakopoulos, R. (2007). Managing grade risk in stope design optimization: probabilistic mathematical programming model and application in sublevel stoping. Mining technology, 116(2), 49-57.
[10] Jalali, S.E, & Hosseini, H, (2009). Optimization of Extraction Range in Underground Mining Using a Greedy Algorithm’, Journal of Science and Research in Mining Engineering, 4(9), pp.1–11.
[11] Alford, C, (1995). Optimization in underground mine design’, Proceedings of the 25th International APCOM Symposium, The Australasian Institute of Mining and Metallurgy, Melbourne.
[12] Ataee-Pour, M, (2005) A critical survey of the existing stope layout optimization techniques’, Journal of Mining Science, 41(5), pp.447–466.
[13] Ataee-pour, M. (2000). A heuristic algorithm to optimize stope boundaries. Ph.D. Thesis, University of Wollongong, New South Wales, Australia.
[14] Cawrse, I. (2001). Multiple Pass Floating Stope Process. Paper presented at the 4th Biennial Strategic Mine Planning Conference, Melbourne.
[15] Sandanayake, D. S. S., Topal, E., & Asad, M. W. A. (2015). Designing an optimal stope layout for underground mining based on a heuristic algorithm. International Journal of Mining Science and Technology, 25(5), 767-772.
[16] Sandanayake, D. S. S., Topal, E., & Asad, M. W. A. (2015). A heuristic approach to optimal design of an underground mine stope layout. Applied Soft Computing, 30, 595-603.
[17] Topal, E. (2003). Advanced underground mine scheduling using mixed integer programming, Doctoral dissertation, PhD thesis, Colorado School of Mines, Golden.
[18] Bai, X, Marcotte, D, & Simon, R, (2013). Underground stope optimization with network flow method’, Computers & Geosciences, 52, pp.361–371.
[19] Cheimanoff, N. M., Deliac, E. P., & Mallet, J. L. (1989). GEOCAD: an alternative CAD and artificial intelligence tool that helps moving from geological resources to mineable reserves. In 21st International Symposium on the Application of Computers and Operations Research in the Mineral Industry (pp. 471-478).
[20] Deraisme, J., De Fouquet, C., & Fraisse, H. (1984). Geostatistical ore-body model for computer optimization of profits from different underground mining methods. 18th APCOM IMM.
[21] Manchuk, J., & Deutsch, C. (2008). Optimizing stope designs and sequences in underground mines. SMETransactions, 324, 67-75.
[22] Jalali, S.E, Ataee-pour, M, Shahriar, K, Elahi-Zeyni, E, & Nikbin, V, (2016). Computer Based Optimization of Underground Mining Area’, Journal of Civil & Environmental Engineering and Science Technology, 48(4), pp.475–489.
[23] Sotoudeh, F., Kakaie, R., & Ataei, M. (2017). Development of a computer program for underground mine stope optimization using a heuristic algorithm. In Proceedings of the First International Conference on Underground Mining Technology (pp. 689-700). Australian Centre for Geomechanics.
[24] Little, J., Knights, P., & Topal, E. (2013). Integrated optimization of underground mine design and scheduling. Journal of the Southern African Institute of Mining and Metallurgy, 113(10), 775-785.
[25] Haycocks, C & Aelick, RC (1992). Sublevel Stoping’, in HL Hartman (ed.), SME Mining Engineering Handbook, Society for Mining, Metallurgy and Exploration Inc., Littleton, pp. 1717-24.
[26] Brazil, M., Lee, D. H., Van Leuven, M., Rubinstein, J. H., Thomas, D. A., and Wormald, N. C. (2003). Optimizing declines in underground mines. Mining Technology, 112 (3), 164-170.
[27] Russell, F., M. (1987). Application of a PC-based network analysis program to mine scheduling. in Proceedings of 20 International Symposium on the Application of Computers and Mathematics in the Mineral Industries, SAIMM, Johannesburg, South Africa, pp. 123-1312.
[28] Hanson, B. D., & Selim, A. A. (1975). Probabilistic simulation of underground production systems. Trans. Soc. Min. Eng. AIME ;( United States), 258(1).
[29] Muge, F. H., Santos, N., Vierira, J. L., and Cortez, L. (1992). Dynamic programming in mine planning and production scheduling. in Proceedings of 23rd Application of Computers and Operations Research in the Mineral Industry, Society of mining Engineering of the American Institute of Mining, Metallurgical, and Petroleum Engineers, Inc., Littleton, Colorado, USA.
[30] Carlyle, W. M., & Eaves, B. C. (2001). Underground planning at Stillwater mining company. Interfaces, 31(4), 50-60.
[31] McIssac, G. (2005). Long-term planning of an underground mine using mixed-integer linear programming. CIM Bulletin, 98(1089), 1-6.
[32] Kuchta, M, Newman, A and Topal, E, (2003). Implementing a production schedule at LKAB’s Kiruna mine, Interfaces, 34 (2):124-134.
[33] Topal, E. (2003). Advanced underground mine scheduling using mixed integer programming (Doctoral dissertation, PhD thesis, Colorado School of Mines, Golden, CO).
[34] Yashar, P., & Hooman, A. N. (2013). A multi-step approach for block-cave production scheduling optimization. International Journal of Mining Science and Technology, 23(5), 739-750.
[35] Trout, L. P. (1995). Underground mine production scheduling using mixed integer programming. In 25th International APCOM Symposium Proceedings (pp. 395-400).
[36] Little, J., Nehring, M., & Topal, E. (2008). A new mixed-integer programming model for mine production scheduling optimisation in sublevel stope mining. In Proceedings-Australian Mining Technology Conference. Twin Waters. The Australasian Institute of Mining and Metallurgy.
[37] Nehring, M., Topal, E., Kizil, M., & Knights, P. (2012). Integrated short-and medium-term underground mine production scheduling. Journal of the Southern African Institute of Mining and Metallurgy, 112(5), 365-378.
[38] Morteza, Osanloo. (2014). Surface Mining Methods Vol. (1), Amirkabir University of Technology Publications.