[1] Osanloo, M., Gholamnejad, J., & Karimi, B. (2008). Long-term open pit mine production planning: a review of models and algorithms. International Journal of Mining, Reclamation and Environment, 22(1), 3-35.
[2] Whittle, J. (1989). The facts and fallacies of open pit optimization. Whittle Programming Pty Ltd., North Balwyn, Victoria, Australia, 1-7.
[3] Underwood, R., & Tolwinski, B. (1998). A mathematical programming viewpoint for solving the ultimate pit problem. European Journal of Operational Research, 107(1), 96-107.
[4] Caccetta, L., & Hill, S. P. (2003). An application of branch and cut to open pit mine scheduling. Journal of global optimization, 27(2-3), 349-365.
[5] Askari-Nasab, H., Pourrahimian, Y., Ben-Awuah, E., & Kalantari, S. (2011). Mixed integer linear programming formulations for open pit production scheduling. Journal of Mining Science, 47(3), 338-359.
[6] Meagher, C., Dimitrakopoulos, R., & Vidal, V. (2014). A new approach to constrained open pit pushback design using dynamic cut-off grades. Journal of Mining Science, 50(4), 733-744.
[7] Moosavi, E., & Gholamnejad, J. (2016). Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade. Journal of Mining Science, 52(5), 956-964.
[8] Moreno, E., Rezakhah, M., Newman, A., & Ferreira, F. (2017). Linear models for stockpiling in open-pit mine production scheduling problems. European Journal of Operational Research, 260(1), 212-221.
[9] Whittle, D., Brazil, M., Grossman, P. A., Rubinstein, J. H., & Thomas, D. A. (2018). Combined optimisation of an open-pit mine outline and the transition depth to underground mining. European Journal of Operational Research, 268(2), 624-634.
[10] Fattahi, P. (1390). Metaheuristic Algorithms. The University of Bu-Ali Sina. (In Persian)
[11] Pana, M. T. (1965, March). The simulation approach to open pit design. In APCOM SYMPOSIUM (Vol. 5, pp. 127-138).
[12] Wright, A. (1999). MOVING CONE II-A simple algorithm for optimum pit limits design. Proceedings of the 28rd APCOM, 367-374.
[13] David, M., Dowd, P. A., & Korobov, S. (1974, April). Forecasting departure from planning in open pit design and grade control. In 12th Symposium on the application of computers and operations research in the mineral industries (APCOM) (Vol. 2, pp. F131-F142).
[14] Denby, B., & Schofield, D. (1994). Open-pit design and scheduling by use of genetic algorithms. Transactions of the Institution of Mining and Metallurgy. Section A. Mining Industry, 103.
[15] Achireko, P. K., & Frimpong, S. (1996). Open pit optimization using artificial neural networks on conditionally simulated blocks. In Proceeding of 26th Int. APCOM Symposium (pp. 285-290).
[16] Lerchs, H., & Grossman, I. F. (1965). Optimum design of open-pit mines. CIM bulletin, 58(633), 47-54.
[17] Johnson, T. B. and Barnes, R. J. (1988). Application of the Maximal Flow algorithm to ultimate pit design. Engineering design: better results through operations research methods, 518-531.
[18] Yegulalp, T. M., & Arias, J. A. (1992, April). A fast algorithm to solve the ultimate pit limit problem. In 23rd International Symposium on the Application of Computers and Operations Research in The Mineral Industries (pp. 391-398). Littleton, Co: AIME.
[19] Roman, R. J. (1974). The role of time value of money in determining an open pit mining sequence and pit limits. In Proc. 12th Symp. Application Computers and Operation Research in the Mineral Industry.
[20] Wang, Q., & Sevim, H. (1992). Enhanced production planning in open pit mining through intelligent dynamic search. Institute of Mining Metallurgy (ed), 23, 461-471.
[21] Wang, Q., & Sevim H. (1993). Open pit production planning through pit-generation and pit-sequencing. Transactions of the American Society for Mining, Metallurgy and Exploration, 294(7), 1968-1972.
[22] Wang, Q., & Sevim H. (1995). Alternative to parameterization in finding a series of maximum-metal pits for production planning. Mining engineering, 178-182.
[23] Latorre E. and Golosinski T. S. (2011). Definition of economic pit limits taking into consideration time value of money. CIM Journal, 2(3), 162-170.
[24] Gershon, M. (1987). Heuristic approaches for mine planning and production scheduling. International Journal of Mining and Geological Engineering, 5(1), 1-13.