[1] Lerchs, H. and FI G. (1964). Optimum design of open-pit mines. in Operations Research. Inst Operations Research Management Sciences 901 Elkridge Landing Rd, Ste 400, Linthicum Hts, Md 21090-2909, B59-&.
[2] Gershon, M. (1987). An open-pit production scheduler: algorithm and implementation. Min. Eng.(Littleton, Colo.);(United States), 39(8).
[3] Wang, Q. and Sevim H. (1992). Enhanced production planning in open pit mining through intelligent dynamic search. Institute of Mining Metallurgy (ed), 23, 461-471.
[4] Denby, B., Schofield D., and Surme T. (1998). Genetic algorithms for flexible scheduling of open pit operations. in Computer applications in the minerals industries. International symposium. 605-616.
[5] Johnson, T.B., Dagdelen K., and Ramazan S. (2002). Open pit mine scheduling based on fundamental tree algorithm. in APCOM 2002: 30 th International Symposium on the Application of Computers and Operations Research in the Mineral Industry. 147-159.
[6] Tolwinski, B. and Golosinski T. (1995). Long term open pit scheduler. Mine Planning and Equipment Selection 1995, 265.
[7] Ramazan, S., Dagdelen K., and Johnson T. (2005). Fundamental tree algorithm in optimising production scheduling for open pit mine design. Mining Technology, 114(1), 45-54.
[8] Akaike, A. and Dagdelen K. (1999). A strategic production scheduling method for an open pit mine. proceedings of the 28th Application of Computers and Operation Research in the Mineral Industry, 729-738.
[9] Godoy, M. and Dimitrakopoulos R. (2004). Managing risk and waste mining in long-term production scheduling of open-pit mines. SME transactions, 316(3).
[10] Roman, R. (1974). The role of time value of money in determining an open pit mining sequence and pit limits. in Proc. 12th Symp. Application Computers and Operation Research in the Mineral Industry.
[11] Tolwtnski, B. and Underwood R. (1996). A scheduling algorithm for open pit mines. IMA Journal of Management Mathematics, 7(3), 247-270.
[12] Dowd, P. (1994). Risk assessment in reserve estimation and open-pit planning. Transactions of the Institution of Mining and Metallurgy(Section A: Mining Industry), 103.
[13] Dimitrakopoulos, R., Farrelly C., and Godoy M. (2002). Moving forward from traditional optimization: grade uncertainty and risk effects in open-pit design. Mining Technology, 111(1), 82-88.
[14] Lamghari, A. and Dimitrakopoulos R. (2012). A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty. European Journal of Operational Research, 222(3), 642-652.
[15] Kumral, M. (2010). Robust stochastic mine production scheduling. Engineering Optimization, 42(6), 567-579.
[16] Mokhtarian Asl, M. and Sattarvand J. (2016). Commodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method. Journal of Mining and Environment, 7(2), 215-227.
[17] Alipour, A., Khodaiari A.A., Jafari A., and Tavakkoli-Moghaddam R. (2017). Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach. Journal of Mining and Environment, 8(2), 255-267.
[18] Bertsimas, D., Pachamanova D., and Sim M. (2004). Robust linear optimization under general norms. Operations Research Letters, 32(6), 510-516.
[19] Ben-Tal, A. and Nemirovski A. (2002). Robust optimization–methodology and applications. Mathematical Programming, 92(3), 453-480.
[20] Soyster, A.L. (1973). Convex programming with set-inclusive constraints and applications to inexact linear programming. Operations research, 21(5), 1154-1157.
[21] Li, Z., Ding R., and Floudas C.A. (2011). A comparative theoretical and computational study on robust counterpart optimization: I. Robust linear optimization and robust mixed integer linear optimization. Industrial & engineering chemistry research, 50(18), 10567-10603.
[22] Bertsimas, D. and Sim M. (2004). The price of robustness. Operations research, 52(1), 35-53.
[23] Li, Z., Tang Q., and Floudas C.A. (2012). A comparative theoretical and computational study on robust counterpart optimization: II. Probabilistic guarantees on constraint satisfaction. Industrial & engineering chemistry research, 51(19), 6769-6788.