[1] M. Koryagin and A. Voronov. (2017). Improving the organization of the shovel-Truck systems in open-pit coal mines. Transp. Probl., vol. 12, no.2, pp. 113–122.
[2] Sattarvand, J (2015). “Using operation research models for optimizing truck-shovel haulage operation.” First jurnal of mining engineering: (in Persian).
[3] A. Moradi Afrapoli, H. Askari-Nasab. (2017). Mining fleet management systems: a review of models and algorithms. Int. J. Mining, Reclam. Environ., vol. 0930, no. June, pp. 1–19.
[4] Y. Lizotte and E. Bonates. (1987). Truck and shovel dispatching rules assessment using simulation. Min. Sci. Technol, vol. 5, no. 1, pp. 45–58.
[5] M. L. Pinedo (2017). “Scheduling: Theory, algorithms, and systems.” Amir Kabir university, Ebook: (in Persian).
[6] Davari, S. and Sattarvand, J (2013). “Simulation of Sungun copper mine haulage system with GPSS/H programming.” Forth jurnal of mining engineering: (in Persian).
[7] Basiri, M. H. and Alamdari, S (2015). “ Simulation of transportation system in Abadeh fireclay mine (by using ARENA software).” Thrid conference of Iran open pit mines: (in Persian).
[8] K. Oraee and B. Asi. (2004). Fuzzy model for truck allocation in surface mines. Proc. 13th Internat. Sympos. Mine Planning Equipment Selection (MPES). pp. 585–591.
[9] N. ÇETIN. (2004). Open-pit truck/shovel haulage system simulation. PhD thesis, University of Middle East Technical University, the Department of Mining Engineering.
[10] A. S. Hashemi and J. Sattarvand, (2015). Simulation Based Investigation of Different Fleet Management Paradigms in Open Pit Mines-A Case Study of Sungun Copper Mine. Arch. Min. Sci.
[11] L. Zh0ang and X. Xia. (2015). An Integer Programming Approach for Truck-Shovel Dispatching Problem in Open-Pit Mines. Energy Procedia, vol. 75, pp. 1779–1784.
[12] C. H. Ta, A. Ingolfsson, and J. Doucette. (2013). A linear model for surface mining haul truck allocation incorporating shovel idle probabilities. Eur. J. Oper. Res., vol. 231, no.3, pp. 770–778.
[13] S. R. Patterson, E. Kozan, and P. Hyland. (2017). Energy efficient scheduling of open-pit coal mine trucks. Eur. J. Oper. Res., vol.262, no. 2, pp.759–770.
[14] J. W. White and J. P. Olson. (1986). Computer-based dispatching in mines with concurrent operating objectives. Min. Eng.(Littleton, Colo.);(United States), vol. 38, no. 11.
[15] J. Elbrond and F. Soumis. (1987). Towards integrated production planning and truck dispatching in open pit mines. International Journal of Surface Mining, Reclamation and Environment.
[16] F. Soumis, J. Ethier, and J. Elbrond. (1989). Evaluation of the new truck dispatching in the mount wright mine. Appl. Comput. Oper. Res. Miner. Ind., pp. 674–682.
[17] Z. Li. (1989). A methodology for the optimum control of shovel and truck operations in open-pit mining. Min. Sci. Technol., 10: 337-340.
[18] Y. Chang, H. Ren, and S. Wang. (2015). Modelling and optimizing an open-pit truck scheduling problem. Discret. Dyn. Nat. Soc.
[19] A. Y. Faiz Fadin. (2017). Simulation–Optimization Truck Dispatch Problem Using Look – Ahead Algorithm in Open Pit Mines. Int. J. GEOMATE, vol. 13, no. 36, pp. 80–86.
[20] M. Soleymani and J. Benndorf. (2018). Simulation-based Optimization Approach for Material Dispatching in Continuous Mining System. Innov. Appl. OR.
[21] Y. Son and S. Dessureault. (2013). Simulation-based robust optimization for complex truck-shovel systems in surface coal mines. Proc. Winter Simul. Conf. pp. 3522–3532.
[22] Azadi, N. Monjezi, M. and Ataeipour, M (2014). “Improvement performance of haulage system of Sungun copper mine using simulation technic.” Engineering modelling journal: (in Persian)