Prediction and Optimization of Roadheader Performance based on Characteristics and Geo-Mechanical Parameters of Rock (Case Study: TABAS Parvedeh coal mine No. 1)

Document Type : Research Article

Authors

1 Dept. of Mining Engineering, Zarand Higher Education Complex, Shahid Bahonar University of Kerman, Kerman, Iran

2 Dept. of Mining Engineering, Faculty of Engineering and Technology, Shahid Bahonar University of Kerman, Kerman, Iran

3 Dept. of Mining and Metallurgy Engineering, Yazd University, Yazd, Iran

10.22034/anm.2025.21296.1628

Abstract

Roadheader machines have good efficiency and flexibility in mechanized tunneling and underground mining. The application of Roadheaders increases the speed of excavation in the tunnels, which dramatically reduces the time and cost of the project. Considering the importance of this issue, this study aims to predict and optimize the penetration rate and excavation speed of Roadheaders using the particle swarm algorithm in Parvadeh No. 1 mechanized coal mine. Therefore, in this study, the characteristics of Roadheaders have been investigated in related studies. All of these studies were divided into two parts: field observations and laboratory tests. In this research, tunnel number one is considered as the case study, which is divided into 30 parts/sections, and in each section, rock core/sample preparation, the number of joints along the tunnel, excavation time, and volume of the excavated rock mass under the Roadheader machine operation were measured. In the laboratory studies section, the rock core was analyzed by the uniaxial compression strength (UCS) test, and finally, a database was provided based on the obtained results. In the following, nonlinear and linear regression models were used to select the best model for estimating the instantaneous cutting rate (ICR) of the Roadheader machine, which expresses the advancing rate of excavation. In these models, parameters including rock quality designation (RQD) of rock mass, tensile strength (σt), UCS, rock mass brittleness index (RMBI), pick consumption index (PCI), pick consumption factor (PCf), and specific energy (SE) were selected as input variables, and ICR was selected as the output variable. By comparing the results, the linear regression model had the highest determination coefficient and performance index, and the lowest root mean square error. Therefore, this model was selected as the most suitable model. In order to optimize ICR, the relationship obtained from the linear regression model was implemented in the particle swarm algorithm. The results showed that to obtain the optimal limit of ICR in the considered case study with a UCS of 1.68 MPa and a RQD of 33.09%, ICR is equal to 33.11 cubic meters per hour.

Keywords

Main Subjects


[1]       Ebrahim Abadi, A. (2012). Introducing a Model for Road headers' Performance Prediction Based on the Specific Energy and the Angle between Tunnel Axis, Quarterly Scientific - Research Journal of Environmental Geology, Year 6, Issue 20 - Shapa 2008-4250.
[2]       Ebrahimabadi, A., Goshtasbi, K., Shahriar, K., and Cherghi, Seifabad, M. (2011). Predictive Models for Roadheaders' Cutting Performance in Coal Measure Rocks”, YERBILIMLERI Journal, Vol. 32, No. 2, pp 89-104.
[3]       Ebrahimabadi, A. (2012). Stability Analysis and Optimum Support Design of Tunnel No. 1 of Central Mine in Tabas Coal Mine Project”, ITA-AITES World Tunnel Congress and 38th General Assembly (2012), Bangkok, Thailand, 8p.
[4]       Ebrahimabadi, A., Azimipour, A and Bahreini, A. (2016). Prediction of Roadheaders’ performance using artificial neural network approaches (MLP and KOSFM)", Tunneling and Underground Space Technology, Volume 59, Pages 127-133.
[5]       Comakli, R., Sair Kahraman, S and Balci, C., (2014). Performance prediction of Roadheaders in metallic ore excavation", Tunneling and Underground Space Technology, 38-45.
[6]       Bilgin, N. and Ocak, I. (2010). Comparative studies on the performance of a Roadheader, impact hammer and drilling and blasting method in the excavation of metro station tunnels in Istanbul", Tunnelling and Underground Space Technology, Volume 25, Issue 2, Pages 181-187.
[7]       Bilgin, N., Dincer, T., Copur, H and Erdogan, M. (2004). Some Geological and Geotechnical Factors Affecting the Performance of a Roadheader in an Inclined Tunnel”, Tunnelling and Underground Space Technology, Vol 19, Elsevier, pp. 629-636.
[8]       Eftekhari, S. M. and Bastami, M. (2020). Effect of the Replacement of Cutting Tools on the Performance of TBM in Tehran Metro Line 6. Journal of Analytical and Numerical Methods in Mining Engineering10(24), 63-76. doi: 10.29252/anm.2020.13703.1438.
[9]       Mokhtarian, M. , Eftekhari, M. and Baghbanan, A. (2014). Application of Principal Component Analysis in Prediction of Penetration Rate of TBM Using Artificial Neural Networks. Journal of Analytical and Numerical Methods in Mining Engineering3(6), 33-43.
[10]    Khodaee Ashestani, S. , Chakeri, H. , Darbor, M. , Khoshzaher, E. and Bazargan, S. S. E. (2023). Estimating Penetration Rate of Excavation Machine Using Geotechnical Parameters and Neural Networks in Tabriz Metro. Journal of Analytical and Numerical Methods in Mining Engineering13(37), 1-9. doi: 10.22034/anm.2023.20414.1604.
[11]    Bilgin, N and Balci, C. (2005). Performance Prediction of Mechanical Excavators in Tunnels, Training Course of Tunnel Engineering, Istanbul Technical University, Turkey.
[12]    Copur, H., Ozdemir, L and Rostami, J. (1998), “Roadheader Applications in Mining and Tunneling Industries”, The Mining Engineering, pp. 38-42.
[13]    Hosseini, A. , Najafi, M. and morshedy, A. H. (2022). The effect of technical parameters of cross-measure boreholes methane drainage method on the amount of exhaust gas (Case study: Tabas Parvadeh coal mine No.1). Journal of Analytical and Numerical Methods in Mining Engineering12(30), 79-89. doi: 10.22034/anm.2022.2570.
[14]    Hosseini A, Najafi M (2021) Determination of Methane Desorption Zone for the design of a drainage borehole Pattern (Case Study: E4 Panel of the Tabas Mechanized Coal Mine, Iran). Rud Zb 36:61–75.
[15]    Hosseini A, Najafi, M and Morshedy, AH. (2022) Determination of suitable distance between methane drainage stations in Tabas mechanized coal mine (Iran) based on theoretical calculations and field investigation. J Min Inst 258:1050–1060.
[16]    Hosseini, A., Najafi, M., Shojaatlhosseini, SA and Rafiee, R. (2017) Determination of a suitable extraction equipment in mechanized longwall mining in steeply inclined coal seams using fuzzy analytical hierarchy method (Case study: Hamkar coal mine, Iran). J Min Environ 8:487–499.
[17]    Dosco Overseas Engineering Ltd, (2008), Newark Nottinghamshire, England, www.dosco.co.uk.
[18]    Rostami, J., Ozdemir, L and Neil, D., M. (1994), “Roadheader Performance Optimization for Mining and Civil Construction”, Proceedings of 13th Annual Technical Meeting of the Institute of Shaft Drilling Technology (ISDT), Las Vegas, pp. 1-17.
[19]    Thuro, K and Plinninger, R.J. (1999), “Roadheader Excavation Performance – Geological and Geotechnical Influences”, 9th ISRM Congress Paris, Theme 3: Rock Dynamics and Tectonophysics/Rock Cutting and Drilling, pp.25-28.
[20]    Mostowfi, N. (2011), learn how to use MATLAB”, Department of Chemical Engineering, Tehran University.
[21]    B. H. G. Brady and E. T. Brown, (1993), "Rock Mechanics for Underground Mining", Second Edition.
[22]    S. Hamekhoni, and Ramzan Ali Royaei, (2022), The Effect of Cultural Factors on Cost Stickiness, Financial Accounting and Auditing Research, Volume 14, Number 54, Pages 159-178.