An excavation operation for the building purposes is a high-risk activity, which is done for different reasons, such as achieving an appropriate level of the earth for foundation or construction of basements. In this paper, using the Slide 6.0 program the stability of a pit wall in the outskirts of Qaen is investigated at first and then the pit wall stability after using soil nailing with various patterns is analyzed. Using back analysis, sensitivity analysis, and probabilistic analysis, this study presents a comprehensive model for analyzing pit walls, and will be useful for excavation operation in neighboring areas as well. Finally, several pit designs with acceptable safety factors have been proposed for pit excavation.
 
Introduction
Due to the growing trend of urban populations, the construction activities are increasing in central and marginal areas of cities. One of the basic concerns in these constructions is the stability of the excavated pit wall. The basic rule of judgment about the stability of a pit wall is the standard safety factor. In the traditional deterministic approach of safety factor calculation, any error or uncertainty in the soil parameters is directly reflected in the results. In recent years, the use of the probabilistic approach that provides additional measures related to the probability of failure and risk rate has become popular. In the probabilistic approach in addition to the mean safety factor, the probability of failure and reliability index are also obtained.
 
Methodology and Approaches
To perform a probabilistic analysis of a pit wall, strength properties of the soil layer and the soil density were defined as variable inputs. The coefficients of variation of these parameters according to laboratory experiments were selected. Normal and log-normal statistical distributions were used for the input variable parameters as recommended by USACE. For the efficient performance of the probabilistic analysis, Monte Carlo simulation was used. This way, and using the Slide 6.0 program, the stability of a pit wall in the outskirts of Qaen is investigated with various patterns of soil nailing as the supporting system.
 
Results and Conclusions
According to the results of this study, the soil is unstable for excavation operation and employing soil nailing technique and reducing the pit wall slope angle are appropriate steps to achieve a secure condition. Several safe pit designs have been proposed for excavating the pit.

Keywords

Main Subjects


1] Fathi, A. (2010). Study of the suitable excavation methods in coarse graine alluvial of Tehran. MSc Thesis, Islamic Azad University, Science and Research Branch (In Persian).
[2] Planning & Development Division, Water & Wastewater Company, Ministry of Energy. (2011). Guidelines for safety of earth excavation. (In Persian).
[3] Maleki, M., Baei, B., & Beiti, M. (2011). Excavation-adjacent structure interaction effect on excavation analysis in urban area. Journal of civil engineering, Vol. 21(2):25-40 (In Persian).
[4] Bishop, A. W. (1955). The use of slip circle in the stability analysis of earth slopes. Geotechnique, 5, 7-17.
[5] Janbu, N. (1954). Application of composite slip circles for stability analysis. In: Proc, fourth European Conference on stability of earth slopes, Vol.3, 43-49.
[6] Razeghi, H.R., and Aghaei Araei, A. (2010). Stability analysis of access road slopes around the milad tower by numerical modeling and artificial neural networks. Vol. 3 (2):649-676 (In Persian).
[7] Mahmoudi, M., Barkhordari K., & Vafaeian M. (2010). Study of the common stabilization methods of excavations in urban area. Proceedings of the Fifth National Conference on Civil Engineering, May 4-6, Mashhad, Iran (In Persian).
[8] FHWA. (2003). Soil nail walls, geotechnnical engineering circular no.7, Report Number FHWA0-IF-03-017. US department of transportation, Federal Highway Administration.
[9] Technical and soil mechanics laboratory company, Ministry of Roads & Urban Development. (2009). Report of soil mechanic studies for construction site of technical and vocational institute of Qaen. (In Persian).
[10] Eberhardt, E. (2003). Rock slope stability analysis utilization of advanced numerical techniques. Earth and Ocean Sciences at UBC, Vancouver, Canada.
[11] Duncan, J.M. (1996). Soil slope stability Analysis. In Tuerner&Schaster (eds), Landslides: Investigation and Mitigation (Special Report 247), National Academy Press, Washington D.C., 337-37.
[12] Duncan, C.W., and Christopher, W.M. (2005). Rock slope engineering. Civil and mining 4th edition, Taylor & Francis e-Library.
[13] Rocscience Inc. (2013). Manual of the 2D limit equilibrium analysis software, Slide 6.0., Website address: http://www.rocscience.com.
[14] Zeaiean Firouzabadi, P., Ghanavati, E., & Bayatisedaghat, Z. (2012). Impact of urban constructions weight on instability, case study (district 1 of region 2 municipality of Tehran). Journal of Applied Research in Geographical Sciences. 12(24):47-63 (In Persian).
[15] Office of National Building Regulations, Ministry of Roads & Urban Development. (2009). Iran's national building regulations, Section VI, loads on buildings (In Persian).
[16] Esfahan steel company. (2013). Steel products catalogue, website: http://www.esfahansteel.com/Catalog1. (In Persian).
[17] Duncan, J.M. (2000). Factors of Safety and Reliability in Geotechnical Engineering, Journal of Geotechnical and Geoenvironmental Engineering, Vol. 126:307-316.
[18] SivakumarBabu, G.L., Srivastava, A., & Sahana, V. (2007). Analysis of stability of earthen dams in kachchh region, Gujarat, India. Engineering Geology 94:123-136.