Keyword Index

A

  • Abouzar Tunnel Numerical investigation of mechanized shield tunnels cross-cut [Volume 8, Issue 16, 2018-2019, Pages 29-43]

B

  • Ball Charge Simulation of Choghart AG mill circuit using JKSimMet software and investigating the possibility of converting to SAG mill [Volume 8, Issue 16, 2018-2019, Pages 71-85]
  • Blasting Prediction of blasting-induced flyrock using M5P tree technique [Volume 8, Issue 16, 2018-2019, Pages 45-55]
  • Brazilian Test Effect of Rock Fracture Filling on Mode I and II Fracture Toughness [Volume 8, Issue 17, 2018-2019, Pages 19-25]
  • Breakage Test Simulation of Choghart AG mill circuit using JKSimMet software and investigating the possibility of converting to SAG mill [Volume 8, Issue 16, 2018-2019, Pages 71-85]
  • Buffon’s needle problem Application of geometric probability to design exploration grid of mineral deposits, case study: porphyry copper index located in the south-west of Kerman [Volume 8, Issue 15, 2018-2019, Pages 39-54]

C

  • Coal mine Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran [Volume 8, Issue 17, 2018-2019, Pages 27-37]
  • Cognitive Map Study of the effects of the environmental factors on mining effluents phytoremediation process efficiency using cognitive map method (Case study: Sungun copper mine) [Volume 8, Issue 15, 2018-2019, Pages 11-24]
  • Conveyor Belt Prioritizing Preventative and Repair Measures of Conveyor Belt Equipment Pieces Using Fuzzy TOPSIS Technique (Case Study: Pelletizing Plant of GolGohar Mining and Industrial Company) [Volume 8, Issue 17, 2018-2019, Pages 63-75]
  • CSCBD Specimen Effect of Rock Fracture Filling on Mode I and II Fracture Toughness [Volume 8, Issue 17, 2018-2019, Pages 19-25]

D

  • Deep excavation Dynamic Analysis of Anchored Diaphragm Walls [Volume 8, Issue 15, 2018-2019, Pages 83-97]
  • Deformation Modulus Effects of Stress Value and Loading Plate Dimensions on In-situ Deformation Modulus of Rock Mass in Plate Loading Test [Volume 8, Issue 16, 2018-2019, Pages 95-106]
  • Deformation Modulus of Rock Mass Efficiency evaluation of empirical models on the basis of rock mass rating for prediction of deformation modulus in rock mass and developing a new models according to the fuzzy system [Volume 8, Issue 16, 2018-2019, Pages 1-11]
  • Diaphragm wall Dynamic Analysis of Anchored Diaphragm Walls [Volume 8, Issue 15, 2018-2019, Pages 83-97]

E

  • Earthquake dynamic load Dynamic Analysis of Anchored Diaphragm Walls [Volume 8, Issue 15, 2018-2019, Pages 83-97]
  • East Azerbaijan Comparative analysis between concentration- number (C-N) and concentration- area (C-A) fractal models for separating anomaly from background in Siahrood 100,000 sheet, NW Iran. [Volume 8, Issue 16, 2018-2019, Pages 87-94]
  • Elastic Constats Evaluation of Specimen Size-Effect in Sedimentary Rocks and Grain Size Effect in Concrete Specimens on Uniaxial Compressive Strength [Volume 8, Issue 16, 2018-2019, Pages 57-70]
  • Empirical Models Efficiency evaluation of empirical models on the basis of rock mass rating for prediction of deformation modulus in rock mass and developing a new models according to the fuzzy system [Volume 8, Issue 16, 2018-2019, Pages 1-11]
  • Environmental Factors Study of the effects of the environmental factors on mining effluents phytoremediation process efficiency using cognitive map method (Case study: Sungun copper mine) [Volume 8, Issue 15, 2018-2019, Pages 11-24]
  • Exploration probability of mineral deposits Application of geometric probability to design exploration grid of mineral deposits, case study: porphyry copper index located in the south-west of Kerman [Volume 8, Issue 15, 2018-2019, Pages 39-54]

F

  • Filtersim Improving Filtersim Simulation Algorithm of Multiple-Point Geostatistics Using New Training Image Based Adaptive Filters and Supervised Hard Data Conditioning [Volume 8, Issue 15, 2018-2019, Pages 55-67]
  • Finite element Dynamic Analysis of Anchored Diaphragm Walls [Volume 8, Issue 15, 2018-2019, Pages 83-97]
  • FLAC3D software Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran [Volume 8, Issue 17, 2018-2019, Pages 27-37]
  • Flyrock Prediction of blasting-induced flyrock using M5P tree technique [Volume 8, Issue 16, 2018-2019, Pages 45-55]
  • Fractal concentration- area model Comparative analysis between concentration- number (C-N) and concentration- area (C-A) fractal models for separating anomaly from background in Siahrood 100,000 sheet, NW Iran. [Volume 8, Issue 16, 2018-2019, Pages 87-94]
  • Fractal concentration- number model Comparative analysis between concentration- number (C-N) and concentration- area (C-A) fractal models for separating anomaly from background in Siahrood 100,000 sheet, NW Iran. [Volume 8, Issue 16, 2018-2019, Pages 87-94]
  • Fracture Energy Evaluation of Specimen Size-Effect in Sedimentary Rocks and Grain Size Effect in Concrete Specimens on Uniaxial Compressive Strength [Volume 8, Issue 16, 2018-2019, Pages 57-70]
  • Fracture Filling Effect of Rock Fracture Filling on Mode I and II Fracture Toughness [Volume 8, Issue 17, 2018-2019, Pages 19-25]
  • Fracture Toughness Effect of Rock Fracture Filling on Mode I and II Fracture Toughness [Volume 8, Issue 17, 2018-2019, Pages 19-25]
  • Fuzzy goal programming A Developed Fuzzy Goal Programming Approach to Determine a Processing Plant Site [Volume 8, Issue 15, 2018-2019, Pages 1-9]
  • Fuzzy Models Efficiency evaluation of empirical models on the basis of rock mass rating for prediction of deformation modulus in rock mass and developing a new models according to the fuzzy system [Volume 8, Issue 16, 2018-2019, Pages 1-11]
  • Fuzzy TOPSIS Prioritizing Preventative and Repair Measures of Conveyor Belt Equipment Pieces Using Fuzzy TOPSIS Technique (Case Study: Pelletizing Plant of GolGohar Mining and Industrial Company) [Volume 8, Issue 17, 2018-2019, Pages 63-75]

G

  • Geochemical anomalies Comparative analysis between concentration- number (C-N) and concentration- area (C-A) fractal models for separating anomaly from background in Siahrood 100,000 sheet, NW Iran. [Volume 8, Issue 16, 2018-2019, Pages 87-94]
  • Geological probability Reserve Estimation at Porphyry Copper Deposits Using Uncertainty Models in Geologic Unit Boundaries [Volume 8, Issue 15, 2018-2019, Pages 69-81]
  • Geological uncertainty Reserve Estimation at Porphyry Copper Deposits Using Uncertainty Models in Geologic Unit Boundaries [Volume 8, Issue 15, 2018-2019, Pages 69-81]
  • Geological uncertainty models Reserve Estimation at Porphyry Copper Deposits Using Uncertainty Models in Geologic Unit Boundaries [Volume 8, Issue 15, 2018-2019, Pages 69-81]
  • Geometric characteristics of joint surfaces The effect of scale on the geometric parameters of the rock joint surfaces [Volume 8, Issue 15, 2018-2019, Pages 99-114]
  • Geometric parameters of the surfaces The effect of scale on the geometric parameters of the rock joint surfaces [Volume 8, Issue 15, 2018-2019, Pages 99-114]
  • Geometric probability Application of geometric probability to design exploration grid of mineral deposits, case study: porphyry copper index located in the south-west of Kerman [Volume 8, Issue 15, 2018-2019, Pages 39-54]
  • Geostatistical simulation Reserve Estimation at Porphyry Copper Deposits Using Uncertainty Models in Geologic Unit Boundaries [Volume 8, Issue 15, 2018-2019, Pages 69-81]
  • Ghoghart AG Mill Simulation of Choghart AG mill circuit using JKSimMet software and investigating the possibility of converting to SAG mill [Volume 8, Issue 16, 2018-2019, Pages 71-85]
  • GolGohar Mining and Industrial Company Prioritizing Preventative and Repair Measures of Conveyor Belt Equipment Pieces Using Fuzzy TOPSIS Technique (Case Study: Pelletizing Plant of GolGohar Mining and Industrial Company) [Volume 8, Issue 17, 2018-2019, Pages 63-75]
  • Grade uncertainty Reserve Estimation at Porphyry Copper Deposits Using Uncertainty Models in Geologic Unit Boundaries [Volume 8, Issue 15, 2018-2019, Pages 69-81]
  • Grain Size Effect Evaluation of Specimen Size-Effect in Sedimentary Rocks and Grain Size Effect in Concrete Specimens on Uniaxial Compressive Strength [Volume 8, Issue 16, 2018-2019, Pages 57-70]

I

  • Inclined anchor Dynamic Analysis of Anchored Diaphragm Walls [Volume 8, Issue 15, 2018-2019, Pages 83-97]
  • In Situ Test Effects of Stress Value and Loading Plate Dimensions on In-situ Deformation Modulus of Rock Mass in Plate Loading Test [Volume 8, Issue 16, 2018-2019, Pages 95-106]

J

  • JKSimMet Simulation of Choghart AG mill circuit using JKSimMet software and investigating the possibility of converting to SAG mill [Volume 8, Issue 16, 2018-2019, Pages 71-85]

K

  • Key block method Discontinued Rock Slope Analysis through a New TFS-KGM Analytical Method [Volume 8, Issue 17, 2018-2019, Pages 1-18]
  • Key group method Discontinued Rock Slope Analysis through a New TFS-KGM Analytical Method [Volume 8, Issue 17, 2018-2019, Pages 1-18]

M

  • M5P technique Prediction of blasting-induced flyrock using M5P tree technique [Volume 8, Issue 16, 2018-2019, Pages 45-55]
  • Magnetic Intensity Two-Dimensional Compact Inversion of Magnetic Data in the Presence of Remanent Magnetization [Volume 8, Issue 17, 2018-2019, Pages 39-51]
  • Marun field Numerical Modeling Of Behaviour Of Wellbore In Shaly Formations using finite difference method (Case study: one of the oil wells in Marun Field) [Volume 8, Issue 15, 2018-2019, Pages 115-130]
  • Mathematical modeling A Developed Fuzzy Goal Programming Approach to Determine a Processing Plant Site [Volume 8, Issue 15, 2018-2019, Pages 1-9]
  • Mining Mining Spare Parts Provision by Reliability Analysis, Case Study: Sungun Copper Mine [Volume 8, Issue 15, 2018-2019, Pages 25-38]
  • Model tree Prediction of blasting-induced flyrock using M5P tree technique [Volume 8, Issue 16, 2018-2019, Pages 45-55]
  • Modified split and fender Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran [Volume 8, Issue 17, 2018-2019, Pages 27-37]
  • Multiple-point Geostatistics Improving Filtersim Simulation Algorithm of Multiple-Point Geostatistics Using New Training Image Based Adaptive Filters and Supervised Hard Data Conditioning [Volume 8, Issue 15, 2018-2019, Pages 55-67]

N

  • Numerical Analysis Dynamic Analysis of Anchored Diaphragm Walls [Volume 8, Issue 15, 2018-2019, Pages 83-97]
  • Numerical modeling Dynamic Analysis of Embankments Reinforced with Micro-Piles [Volume 8, Issue 17, 2018-2019, Pages 53-61]
  • Numerical modeling Numerical Modeling Of Behaviour Of Wellbore In Shaly Formations using finite difference method (Case study: one of the oil wells in Marun Field) [Volume 8, Issue 15, 2018-2019, Pages 115-130]
  • Numerical modeling Investigate the effect of rock mass joint intensity on performance of support systems in the tunnel by using DFN-DEM numerical modeling (Case study: the access tunnel of Rudbar Lorestan Dam plant) [Volume 8, Issue 16, 2018-2019, Pages 13-27]

O

  • Open pit mines Prediction of blasting-induced flyrock using M5P tree technique [Volume 8, Issue 16, 2018-2019, Pages 45-55]
  • Optimum exploration grid Application of geometric probability to design exploration grid of mineral deposits, case study: porphyry copper index located in the south-west of Kerman [Volume 8, Issue 15, 2018-2019, Pages 39-54]

P

  • Pelletizing Plant Prioritizing Preventative and Repair Measures of Conveyor Belt Equipment Pieces Using Fuzzy TOPSIS Technique (Case Study: Pelletizing Plant of GolGohar Mining and Industrial Company) [Volume 8, Issue 17, 2018-2019, Pages 63-75]
  • PFC3D software Investigate the effect of rock mass joint intensity on performance of support systems in the tunnel by using DFN-DEM numerical modeling (Case study: the access tunnel of Rudbar Lorestan Dam plant) [Volume 8, Issue 16, 2018-2019, Pages 13-27]
  • Phytoremediation Study of the effects of the environmental factors on mining effluents phytoremediation process efficiency using cognitive map method (Case study: Sungun copper mine) [Volume 8, Issue 15, 2018-2019, Pages 11-24]
  • Pillar recovery Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran [Volume 8, Issue 17, 2018-2019, Pages 27-37]
  • Plate Loading Test Effects of Stress Value and Loading Plate Dimensions on In-situ Deformation Modulus of Rock Mass in Plate Loading Test [Volume 8, Issue 16, 2018-2019, Pages 95-106]
  • Porphyry copper index in the south-west of Kerman Application of geometric probability to design exploration grid of mineral deposits, case study: porphyry copper index located in the south-west of Kerman [Volume 8, Issue 15, 2018-2019, Pages 39-54]
  • Preventative and Repair Measures Prioritizing Preventative and Repair Measures of Conveyor Belt Equipment Pieces Using Fuzzy TOPSIS Technique (Case Study: Pelletizing Plant of GolGohar Mining and Industrial Company) [Volume 8, Issue 17, 2018-2019, Pages 63-75]
  • Principle components analysis Improving Filtersim Simulation Algorithm of Multiple-Point Geostatistics Using New Training Image Based Adaptive Filters and Supervised Hard Data Conditioning [Volume 8, Issue 15, 2018-2019, Pages 55-67]
  • Processing plant A Developed Fuzzy Goal Programming Approach to Determine a Processing Plant Site [Volume 8, Issue 15, 2018-2019, Pages 1-9]

R

  • Reliability Mining Spare Parts Provision by Reliability Analysis, Case Study: Sungun Copper Mine [Volume 8, Issue 15, 2018-2019, Pages 25-38]
  • Remnant Magnetization Two-Dimensional Compact Inversion of Magnetic Data in the Presence of Remanent Magnetization [Volume 8, Issue 17, 2018-2019, Pages 39-51]
  • Rock-Like Material Effect of Rock Fracture Filling on Mode I and II Fracture Toughness [Volume 8, Issue 17, 2018-2019, Pages 19-25]
  • Rock Mass Effects of Stress Value and Loading Plate Dimensions on In-situ Deformation Modulus of Rock Mass in Plate Loading Test [Volume 8, Issue 16, 2018-2019, Pages 95-106]
  • Rock Mass Rating Efficiency evaluation of empirical models on the basis of rock mass rating for prediction of deformation modulus in rock mass and developing a new models according to the fuzzy system [Volume 8, Issue 16, 2018-2019, Pages 1-11]
  • Rock slope stability analysis Discontinued Rock Slope Analysis through a New TFS-KGM Analytical Method [Volume 8, Issue 17, 2018-2019, Pages 1-18]
  • Room and pillar Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran [Volume 8, Issue 17, 2018-2019, Pages 27-37]
  • Rudbar Lorestan dam Investigate the effect of rock mass joint intensity on performance of support systems in the tunnel by using DFN-DEM numerical modeling (Case study: the access tunnel of Rudbar Lorestan Dam plant) [Volume 8, Issue 16, 2018-2019, Pages 13-27]

S

  • Scale effect The effect of scale on the geometric parameters of the rock joint surfaces [Volume 8, Issue 15, 2018-2019, Pages 99-114]
  • Sequential gaussian simulation Reserve Estimation at Porphyry Copper Deposits Using Uncertainty Models in Geologic Unit Boundaries [Volume 8, Issue 15, 2018-2019, Pages 69-81]
  • Sequential indicator simulation Reserve Estimation at Porphyry Copper Deposits Using Uncertainty Models in Geologic Unit Boundaries [Volume 8, Issue 15, 2018-2019, Pages 69-81]
  • Shale formation Numerical Modeling Of Behaviour Of Wellbore In Shaly Formations using finite difference method (Case study: one of the oil wells in Marun Field) [Volume 8, Issue 15, 2018-2019, Pages 115-130]
  • Shortwall mining Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran [Volume 8, Issue 17, 2018-2019, Pages 27-37]
  • Site selection A Developed Fuzzy Goal Programming Approach to Determine a Processing Plant Site [Volume 8, Issue 15, 2018-2019, Pages 1-9]
  • Slope stability Dynamic Analysis of Embankments Reinforced with Micro-Piles [Volume 8, Issue 17, 2018-2019, Pages 53-61]
  • Spare parts Mining Spare Parts Provision by Reliability Analysis, Case Study: Sungun Copper Mine [Volume 8, Issue 15, 2018-2019, Pages 25-38]
  • Specimen Size-Effect Evaluation of Specimen Size-Effect in Sedimentary Rocks and Grain Size Effect in Concrete Specimens on Uniaxial Compressive Strength [Volume 8, Issue 16, 2018-2019, Pages 57-70]
  • Stability analysis of tunnel linings Numerical investigation of mechanized shield tunnels cross-cut [Volume 8, Issue 16, 2018-2019, Pages 29-43]
  • Statistical Analysis Evaluation of Specimen Size-Effect in Sedimentary Rocks and Grain Size Effect in Concrete Specimens on Uniaxial Compressive Strength [Volume 8, Issue 16, 2018-2019, Pages 57-70]
  • Stress Effects of Stress Value and Loading Plate Dimensions on In-situ Deformation Modulus of Rock Mass in Plate Loading Test [Volume 8, Issue 16, 2018-2019, Pages 95-106]
  • Sungun Copper Mine Mining Spare Parts Provision by Reliability Analysis, Case Study: Sungun Copper Mine [Volume 8, Issue 15, 2018-2019, Pages 25-38]
  • Sungun Copper Mine Prediction of blasting-induced flyrock using M5P tree technique [Volume 8, Issue 16, 2018-2019, Pages 45-55]
  • Sungun Copper Mine A Developed Fuzzy Goal Programming Approach to Determine a Processing Plant Site [Volume 8, Issue 15, 2018-2019, Pages 1-9]
  • Sungun Copper Mine Study of the effects of the environmental factors on mining effluents phytoremediation process efficiency using cognitive map method (Case study: Sungun copper mine) [Volume 8, Issue 15, 2018-2019, Pages 11-24]
  • Susceptibility Two-Dimensional Compact Inversion of Magnetic Data in the Presence of Remanent Magnetization [Volume 8, Issue 17, 2018-2019, Pages 39-51]

T

  • Tehran Metro L7 Numerical investigation of mechanized shield tunnels cross-cut [Volume 8, Issue 16, 2018-2019, Pages 29-43]
  • Time history Dynamic Analysis of Anchored Diaphragm Walls [Volume 8, Issue 15, 2018-2019, Pages 83-97]
  • Tire Mining Spare Parts Provision by Reliability Analysis, Case Study: Sungun Copper Mine [Volume 8, Issue 15, 2018-2019, Pages 25-38]
  • Toppling-free fall-shearing key group method Discontinued Rock Slope Analysis through a New TFS-KGM Analytical Method [Volume 8, Issue 17, 2018-2019, Pages 1-18]
  • Total Magnitude Anomaly Two-Dimensional Compact Inversion of Magnetic Data in the Presence of Remanent Magnetization [Volume 8, Issue 17, 2018-2019, Pages 39-51]
  • Tunnels cross-cut Numerical investigation of mechanized shield tunnels cross-cut [Volume 8, Issue 16, 2018-2019, Pages 29-43]
  • Tunnels interaction Numerical investigation of mechanized shield tunnels cross-cut [Volume 8, Issue 16, 2018-2019, Pages 29-43]
  • Tunnel support system Investigate the effect of rock mass joint intensity on performance of support systems in the tunnel by using DFN-DEM numerical modeling (Case study: the access tunnel of Rudbar Lorestan Dam plant) [Volume 8, Issue 16, 2018-2019, Pages 13-27]

U

  • Uniaxial Compressive Strength Evaluation of Specimen Size-Effect in Sedimentary Rocks and Grain Size Effect in Concrete Specimens on Uniaxial Compressive Strength [Volume 8, Issue 16, 2018-2019, Pages 57-70]

W

  • Wellbore Numerical Modeling Of Behaviour Of Wellbore In Shaly Formations using finite difference method (Case study: one of the oil wells in Marun Field) [Volume 8, Issue 15, 2018-2019, Pages 115-130]