A
-
Abouzar Tunnel
Numerical investigation of mechanized shield tunnels cross-cut [Volume 8, Issue 16, 2018-2019, Pages 29-43]
B
-
Ball Charge
Simulation of Choghart AG mill circuit using JKSimMet software and investigating the possibility of converting to SAG mill [Volume 8, Issue 16, 2018-2019, Pages 71-85]
-
Blasting
Prediction of blasting-induced flyrock using M5P tree technique [Volume 8, Issue 16, 2018-2019, Pages 45-55]
-
Brazilian Test
Effect of Rock Fracture Filling on Mode I and II Fracture Toughness [Volume 8, Issue 17, 2018-2019, Pages 19-25]
-
Breakage Test
Simulation of Choghart AG mill circuit using JKSimMet software and investigating the possibility of converting to SAG mill [Volume 8, Issue 16, 2018-2019, Pages 71-85]
-
Buffon’s needle problem
Application of geometric probability to design exploration grid of mineral deposits, case study: porphyry copper index located in the south-west of Kerman [Volume 8, Issue 15, 2018-2019, Pages 39-54]
C
-
Coal mine
Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran [Volume 8, Issue 17, 2018-2019, Pages 27-37]
-
Cognitive Map
Study of the effects of the environmental factors on mining effluents phytoremediation process efficiency using cognitive map method (Case study: Sungun copper mine) [Volume 8, Issue 15, 2018-2019, Pages 11-24]
-
Conveyor Belt
Prioritizing Preventative and Repair Measures of Conveyor Belt Equipment Pieces Using Fuzzy TOPSIS Technique (Case Study: Pelletizing Plant of GolGohar Mining and Industrial Company) [Volume 8, Issue 17, 2018-2019, Pages 63-75]
-
CSCBD Specimen
Effect of Rock Fracture Filling on Mode I and II Fracture Toughness [Volume 8, Issue 17, 2018-2019, Pages 19-25]
D
-
Deep excavation
Dynamic Analysis of Anchored Diaphragm Walls [Volume 8, Issue 15, 2018-2019, Pages 83-97]
-
Deformation Modulus
Effects of Stress Value and Loading Plate Dimensions on In-situ Deformation Modulus of Rock Mass in Plate Loading Test [Volume 8, Issue 16, 2018-2019, Pages 95-106]
-
Deformation Modulus of Rock Mass
Efficiency evaluation of empirical models on the basis of rock mass rating for prediction of deformation modulus in rock mass and developing a new models according to the fuzzy system [Volume 8, Issue 16, 2018-2019, Pages 1-11]
-
Diaphragm wall
Dynamic Analysis of Anchored Diaphragm Walls [Volume 8, Issue 15, 2018-2019, Pages 83-97]
E
-
Earthquake dynamic load
Dynamic Analysis of Anchored Diaphragm Walls [Volume 8, Issue 15, 2018-2019, Pages 83-97]
-
East Azerbaijan
Comparative analysis between concentration- number (C-N) and concentration- area (C-A) fractal models for separating anomaly from background in Siahrood 100,000 sheet, NW Iran. [Volume 8, Issue 16, 2018-2019, Pages 87-94]
-
Elastic Constats
Evaluation of Specimen Size-Effect in Sedimentary Rocks and Grain Size Effect in Concrete Specimens on Uniaxial Compressive Strength [Volume 8, Issue 16, 2018-2019, Pages 57-70]
-
Empirical Models
Efficiency evaluation of empirical models on the basis of rock mass rating for prediction of deformation modulus in rock mass and developing a new models according to the fuzzy system [Volume 8, Issue 16, 2018-2019, Pages 1-11]
-
Environmental Factors
Study of the effects of the environmental factors on mining effluents phytoremediation process efficiency using cognitive map method (Case study: Sungun copper mine) [Volume 8, Issue 15, 2018-2019, Pages 11-24]
-
Exploration probability of mineral deposits
Application of geometric probability to design exploration grid of mineral deposits, case study: porphyry copper index located in the south-west of Kerman [Volume 8, Issue 15, 2018-2019, Pages 39-54]
F
-
Filtersim
Improving Filtersim Simulation Algorithm of Multiple-Point Geostatistics Using New Training Image Based Adaptive Filters and Supervised Hard Data Conditioning [Volume 8, Issue 15, 2018-2019, Pages 55-67]
-
Finite element
Dynamic Analysis of Anchored Diaphragm Walls [Volume 8, Issue 15, 2018-2019, Pages 83-97]
-
FLAC3D software
Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran [Volume 8, Issue 17, 2018-2019, Pages 27-37]
-
Flyrock
Prediction of blasting-induced flyrock using M5P tree technique [Volume 8, Issue 16, 2018-2019, Pages 45-55]
-
Fractal concentration- area model
Comparative analysis between concentration- number (C-N) and concentration- area (C-A) fractal models for separating anomaly from background in Siahrood 100,000 sheet, NW Iran. [Volume 8, Issue 16, 2018-2019, Pages 87-94]
-
Fractal concentration- number model
Comparative analysis between concentration- number (C-N) and concentration- area (C-A) fractal models for separating anomaly from background in Siahrood 100,000 sheet, NW Iran. [Volume 8, Issue 16, 2018-2019, Pages 87-94]
-
Fracture Energy
Evaluation of Specimen Size-Effect in Sedimentary Rocks and Grain Size Effect in Concrete Specimens on Uniaxial Compressive Strength [Volume 8, Issue 16, 2018-2019, Pages 57-70]
-
Fracture Filling
Effect of Rock Fracture Filling on Mode I and II Fracture Toughness [Volume 8, Issue 17, 2018-2019, Pages 19-25]
-
Fracture Toughness
Effect of Rock Fracture Filling on Mode I and II Fracture Toughness [Volume 8, Issue 17, 2018-2019, Pages 19-25]
-
Fuzzy goal programming
A Developed Fuzzy Goal Programming Approach to Determine a Processing Plant Site [Volume 8, Issue 15, 2018-2019, Pages 1-9]
-
Fuzzy Models
Efficiency evaluation of empirical models on the basis of rock mass rating for prediction of deformation modulus in rock mass and developing a new models according to the fuzzy system [Volume 8, Issue 16, 2018-2019, Pages 1-11]
-
Fuzzy TOPSIS
Prioritizing Preventative and Repair Measures of Conveyor Belt Equipment Pieces Using Fuzzy TOPSIS Technique (Case Study: Pelletizing Plant of GolGohar Mining and Industrial Company) [Volume 8, Issue 17, 2018-2019, Pages 63-75]
G
-
Geochemical anomalies
Comparative analysis between concentration- number (C-N) and concentration- area (C-A) fractal models for separating anomaly from background in Siahrood 100,000 sheet, NW Iran. [Volume 8, Issue 16, 2018-2019, Pages 87-94]
-
Geological probability
Reserve Estimation at Porphyry Copper Deposits Using Uncertainty Models in Geologic Unit Boundaries [Volume 8, Issue 15, 2018-2019, Pages 69-81]
-
Geological uncertainty
Reserve Estimation at Porphyry Copper Deposits Using Uncertainty Models in Geologic Unit Boundaries [Volume 8, Issue 15, 2018-2019, Pages 69-81]
-
Geological uncertainty models
Reserve Estimation at Porphyry Copper Deposits Using Uncertainty Models in Geologic Unit Boundaries [Volume 8, Issue 15, 2018-2019, Pages 69-81]
-
Geometric characteristics of joint surfaces
The effect of scale on the geometric parameters of the rock joint surfaces [Volume 8, Issue 15, 2018-2019, Pages 99-114]
-
Geometric parameters of the surfaces
The effect of scale on the geometric parameters of the rock joint surfaces [Volume 8, Issue 15, 2018-2019, Pages 99-114]
-
Geometric probability
Application of geometric probability to design exploration grid of mineral deposits, case study: porphyry copper index located in the south-west of Kerman [Volume 8, Issue 15, 2018-2019, Pages 39-54]
-
Geostatistical simulation
Reserve Estimation at Porphyry Copper Deposits Using Uncertainty Models in Geologic Unit Boundaries [Volume 8, Issue 15, 2018-2019, Pages 69-81]
-
Ghoghart AG Mill
Simulation of Choghart AG mill circuit using JKSimMet software and investigating the possibility of converting to SAG mill [Volume 8, Issue 16, 2018-2019, Pages 71-85]
-
GolGohar Mining and Industrial Company
Prioritizing Preventative and Repair Measures of Conveyor Belt Equipment Pieces Using Fuzzy TOPSIS Technique (Case Study: Pelletizing Plant of GolGohar Mining and Industrial Company) [Volume 8, Issue 17, 2018-2019, Pages 63-75]
-
Grade uncertainty
Reserve Estimation at Porphyry Copper Deposits Using Uncertainty Models in Geologic Unit Boundaries [Volume 8, Issue 15, 2018-2019, Pages 69-81]
-
Grain Size Effect
Evaluation of Specimen Size-Effect in Sedimentary Rocks and Grain Size Effect in Concrete Specimens on Uniaxial Compressive Strength [Volume 8, Issue 16, 2018-2019, Pages 57-70]
I
-
Inclined anchor
Dynamic Analysis of Anchored Diaphragm Walls [Volume 8, Issue 15, 2018-2019, Pages 83-97]
-
In Situ Test
Effects of Stress Value and Loading Plate Dimensions on In-situ Deformation Modulus of Rock Mass in Plate Loading Test [Volume 8, Issue 16, 2018-2019, Pages 95-106]
J
-
JKSimMet
Simulation of Choghart AG mill circuit using JKSimMet software and investigating the possibility of converting to SAG mill [Volume 8, Issue 16, 2018-2019, Pages 71-85]
K
-
Key block method
Discontinued Rock Slope Analysis through a New TFS-KGM Analytical Method [Volume 8, Issue 17, 2018-2019, Pages 1-18]
-
Key group method
Discontinued Rock Slope Analysis through a New TFS-KGM Analytical Method [Volume 8, Issue 17, 2018-2019, Pages 1-18]
M
-
M5P technique
Prediction of blasting-induced flyrock using M5P tree technique [Volume 8, Issue 16, 2018-2019, Pages 45-55]
-
Magnetic Intensity
Two-Dimensional Compact Inversion of Magnetic Data in the Presence of Remanent Magnetization [Volume 8, Issue 17, 2018-2019, Pages 39-51]
-
Marun field
Numerical Modeling Of Behaviour Of Wellbore In Shaly Formations using finite difference method (Case study: one of the oil wells in Marun Field) [Volume 8, Issue 15, 2018-2019, Pages 115-130]
-
Mathematical modeling
A Developed Fuzzy Goal Programming Approach to Determine a Processing Plant Site [Volume 8, Issue 15, 2018-2019, Pages 1-9]
-
Mining
Mining Spare Parts Provision by Reliability Analysis, Case Study: Sungun Copper Mine [Volume 8, Issue 15, 2018-2019, Pages 25-38]
-
Model tree
Prediction of blasting-induced flyrock using M5P tree technique [Volume 8, Issue 16, 2018-2019, Pages 45-55]
-
Modified split and fender
Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran [Volume 8, Issue 17, 2018-2019, Pages 27-37]
-
Multiple-point Geostatistics
Improving Filtersim Simulation Algorithm of Multiple-Point Geostatistics Using New Training Image Based Adaptive Filters and Supervised Hard Data Conditioning [Volume 8, Issue 15, 2018-2019, Pages 55-67]
N
-
Numerical Analysis
Dynamic Analysis of Anchored Diaphragm Walls [Volume 8, Issue 15, 2018-2019, Pages 83-97]
-
Numerical modeling
Dynamic Analysis of Embankments Reinforced with Micro-Piles [Volume 8, Issue 17, 2018-2019, Pages 53-61]
-
Numerical modeling
Numerical Modeling Of Behaviour Of Wellbore In Shaly Formations using finite difference method (Case study: one of the oil wells in Marun Field) [Volume 8, Issue 15, 2018-2019, Pages 115-130]
-
Numerical modeling
Investigate the effect of rock mass joint intensity on performance of support systems in the tunnel by using DFN-DEM numerical modeling (Case study: the access tunnel of Rudbar Lorestan Dam plant) [Volume 8, Issue 16, 2018-2019, Pages 13-27]
O
-
Open pit mines
Prediction of blasting-induced flyrock using M5P tree technique [Volume 8, Issue 16, 2018-2019, Pages 45-55]
-
Optimum exploration grid
Application of geometric probability to design exploration grid of mineral deposits, case study: porphyry copper index located in the south-west of Kerman [Volume 8, Issue 15, 2018-2019, Pages 39-54]
P
-
Pelletizing Plant
Prioritizing Preventative and Repair Measures of Conveyor Belt Equipment Pieces Using Fuzzy TOPSIS Technique (Case Study: Pelletizing Plant of GolGohar Mining and Industrial Company) [Volume 8, Issue 17, 2018-2019, Pages 63-75]
-
PFC3D software
Investigate the effect of rock mass joint intensity on performance of support systems in the tunnel by using DFN-DEM numerical modeling (Case study: the access tunnel of Rudbar Lorestan Dam plant) [Volume 8, Issue 16, 2018-2019, Pages 13-27]
-
Phytoremediation
Study of the effects of the environmental factors on mining effluents phytoremediation process efficiency using cognitive map method (Case study: Sungun copper mine) [Volume 8, Issue 15, 2018-2019, Pages 11-24]
-
Pillar recovery
Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran [Volume 8, Issue 17, 2018-2019, Pages 27-37]
-
Plate Loading Test
Effects of Stress Value and Loading Plate Dimensions on In-situ Deformation Modulus of Rock Mass in Plate Loading Test [Volume 8, Issue 16, 2018-2019, Pages 95-106]
-
Porphyry copper index in the south-west of Kerman
Application of geometric probability to design exploration grid of mineral deposits, case study: porphyry copper index located in the south-west of Kerman [Volume 8, Issue 15, 2018-2019, Pages 39-54]
-
Preventative and Repair Measures
Prioritizing Preventative and Repair Measures of Conveyor Belt Equipment Pieces Using Fuzzy TOPSIS Technique (Case Study: Pelletizing Plant of GolGohar Mining and Industrial Company) [Volume 8, Issue 17, 2018-2019, Pages 63-75]
-
Principle components analysis
Improving Filtersim Simulation Algorithm of Multiple-Point Geostatistics Using New Training Image Based Adaptive Filters and Supervised Hard Data Conditioning [Volume 8, Issue 15, 2018-2019, Pages 55-67]
-
Processing plant
A Developed Fuzzy Goal Programming Approach to Determine a Processing Plant Site [Volume 8, Issue 15, 2018-2019, Pages 1-9]
R
-
Reliability
Mining Spare Parts Provision by Reliability Analysis, Case Study: Sungun Copper Mine [Volume 8, Issue 15, 2018-2019, Pages 25-38]
-
Remnant Magnetization
Two-Dimensional Compact Inversion of Magnetic Data in the Presence of Remanent Magnetization [Volume 8, Issue 17, 2018-2019, Pages 39-51]
-
Rock-Like Material
Effect of Rock Fracture Filling on Mode I and II Fracture Toughness [Volume 8, Issue 17, 2018-2019, Pages 19-25]
-
Rock Mass
Effects of Stress Value and Loading Plate Dimensions on In-situ Deformation Modulus of Rock Mass in Plate Loading Test [Volume 8, Issue 16, 2018-2019, Pages 95-106]
-
Rock Mass Rating
Efficiency evaluation of empirical models on the basis of rock mass rating for prediction of deformation modulus in rock mass and developing a new models according to the fuzzy system [Volume 8, Issue 16, 2018-2019, Pages 1-11]
-
Rock slope stability analysis
Discontinued Rock Slope Analysis through a New TFS-KGM Analytical Method [Volume 8, Issue 17, 2018-2019, Pages 1-18]
-
Room and pillar
Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran [Volume 8, Issue 17, 2018-2019, Pages 27-37]
-
Rudbar Lorestan dam
Investigate the effect of rock mass joint intensity on performance of support systems in the tunnel by using DFN-DEM numerical modeling (Case study: the access tunnel of Rudbar Lorestan Dam plant) [Volume 8, Issue 16, 2018-2019, Pages 13-27]
S
-
Scale effect
The effect of scale on the geometric parameters of the rock joint surfaces [Volume 8, Issue 15, 2018-2019, Pages 99-114]
-
Sequential gaussian simulation
Reserve Estimation at Porphyry Copper Deposits Using Uncertainty Models in Geologic Unit Boundaries [Volume 8, Issue 15, 2018-2019, Pages 69-81]
-
Sequential indicator simulation
Reserve Estimation at Porphyry Copper Deposits Using Uncertainty Models in Geologic Unit Boundaries [Volume 8, Issue 15, 2018-2019, Pages 69-81]
-
Shale formation
Numerical Modeling Of Behaviour Of Wellbore In Shaly Formations using finite difference method (Case study: one of the oil wells in Marun Field) [Volume 8, Issue 15, 2018-2019, Pages 115-130]
-
Shortwall mining
Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran [Volume 8, Issue 17, 2018-2019, Pages 27-37]
-
Site selection
A Developed Fuzzy Goal Programming Approach to Determine a Processing Plant Site [Volume 8, Issue 15, 2018-2019, Pages 1-9]
-
Slope stability
Dynamic Analysis of Embankments Reinforced with Micro-Piles [Volume 8, Issue 17, 2018-2019, Pages 53-61]
-
Spare parts
Mining Spare Parts Provision by Reliability Analysis, Case Study: Sungun Copper Mine [Volume 8, Issue 15, 2018-2019, Pages 25-38]
-
Specimen Size-Effect
Evaluation of Specimen Size-Effect in Sedimentary Rocks and Grain Size Effect in Concrete Specimens on Uniaxial Compressive Strength [Volume 8, Issue 16, 2018-2019, Pages 57-70]
-
Stability analysis of tunnel linings
Numerical investigation of mechanized shield tunnels cross-cut [Volume 8, Issue 16, 2018-2019, Pages 29-43]
-
Statistical Analysis
Evaluation of Specimen Size-Effect in Sedimentary Rocks and Grain Size Effect in Concrete Specimens on Uniaxial Compressive Strength [Volume 8, Issue 16, 2018-2019, Pages 57-70]
-
Stress
Effects of Stress Value and Loading Plate Dimensions on In-situ Deformation Modulus of Rock Mass in Plate Loading Test [Volume 8, Issue 16, 2018-2019, Pages 95-106]
-
Sungun Copper Mine
Mining Spare Parts Provision by Reliability Analysis, Case Study: Sungun Copper Mine [Volume 8, Issue 15, 2018-2019, Pages 25-38]
-
Sungun Copper Mine
Prediction of blasting-induced flyrock using M5P tree technique [Volume 8, Issue 16, 2018-2019, Pages 45-55]
-
Sungun Copper Mine
A Developed Fuzzy Goal Programming Approach to Determine a Processing Plant Site [Volume 8, Issue 15, 2018-2019, Pages 1-9]
-
Sungun Copper Mine
Study of the effects of the environmental factors on mining effluents phytoremediation process efficiency using cognitive map method (Case study: Sungun copper mine) [Volume 8, Issue 15, 2018-2019, Pages 11-24]
-
Susceptibility
Two-Dimensional Compact Inversion of Magnetic Data in the Presence of Remanent Magnetization [Volume 8, Issue 17, 2018-2019, Pages 39-51]
T
-
Tehran Metro L7
Numerical investigation of mechanized shield tunnels cross-cut [Volume 8, Issue 16, 2018-2019, Pages 29-43]
-
Time history
Dynamic Analysis of Anchored Diaphragm Walls [Volume 8, Issue 15, 2018-2019, Pages 83-97]
-
Tire
Mining Spare Parts Provision by Reliability Analysis, Case Study: Sungun Copper Mine [Volume 8, Issue 15, 2018-2019, Pages 25-38]
-
Toppling-free fall-shearing key group method
Discontinued Rock Slope Analysis through a New TFS-KGM Analytical Method [Volume 8, Issue 17, 2018-2019, Pages 1-18]
-
Total Magnitude Anomaly
Two-Dimensional Compact Inversion of Magnetic Data in the Presence of Remanent Magnetization [Volume 8, Issue 17, 2018-2019, Pages 39-51]
-
Tunnels cross-cut
Numerical investigation of mechanized shield tunnels cross-cut [Volume 8, Issue 16, 2018-2019, Pages 29-43]
-
Tunnels interaction
Numerical investigation of mechanized shield tunnels cross-cut [Volume 8, Issue 16, 2018-2019, Pages 29-43]
-
Tunnel support system
Investigate the effect of rock mass joint intensity on performance of support systems in the tunnel by using DFN-DEM numerical modeling (Case study: the access tunnel of Rudbar Lorestan Dam plant) [Volume 8, Issue 16, 2018-2019, Pages 13-27]
U
-
Uniaxial Compressive Strength
Evaluation of Specimen Size-Effect in Sedimentary Rocks and Grain Size Effect in Concrete Specimens on Uniaxial Compressive Strength [Volume 8, Issue 16, 2018-2019, Pages 57-70]
W
-
Wellbore
Numerical Modeling Of Behaviour Of Wellbore In Shaly Formations using finite difference method (Case study: one of the oil wells in Marun Field) [Volume 8, Issue 15, 2018-2019, Pages 115-130]
Your query does not match with any item