Main Subjects = Mining ٍExploitation
Using financial derivatives in the Lorestan market of building stones

Articles in Press, Accepted Manuscript, Available Online from 07 December 2022

10.22034/anm.2022.2892

mojtaba moradipour


A review on application of acoustic signal analysis in rock drilling operation

Volume 13, Issue 36, October 2023, Pages 47-59

10.22034/anm.2022.2858

Mojtaba Yari; Raheb Bagherpour; Mehrbod Khoshouei


Designing the most probable final pit limit of open pit mines considering price uncertainty

Volume 12, Issue 32, October 2022, Pages 77-86

10.22034/anm.2022.2670

Javad Gholamnejad; Elham lotfi; Mehdi Najafi; Mohammad sadegh Zamani


A comparative study on the application of Regression-PSO and ANN methods to predict backbreak in open pit mines

Volume 11, Issue 29, February 2022, Pages 55-66

10.22034/anm.2022.2633

Masoud Shamsoddin Saeed; Hossein Jalalifar; Hamed Shamsoddini; Mohammad Darbor


Short-Term Linear Production scheduling for Mineral Reserves with Severe Geological Variability

Volume 11, Issue 27, July 2021, Pages 67-77

10.22034/anm.2021.2023

Reza Pour Yazdan Panah; ali azimi; Alireza Jabinpour


Designing an entrepreneurial policy model in the field of mines in Sistan and Baluchestan province

Volume 11, Issue 26, April 2021, Pages 1-12

10.22034/anm.2021.1965

Maryam maleki; habib salarzehi; abdolali keshtgar; alame kikha; ebrahim Haddadi


Statistical and intelligent modeling of underground open stope stability based on the stability graph method

Volume 11, Issue 26, April 2021, Pages 47-58

10.22034/anm.2021.1939

mahmood Sharifi; sadjad Mohammadi; mohammad Ataei; Reza Khaloo kakaei


Optimization of the Long-Term Production Scheduling Model by Considering the Grade Uncertainty by the Lagrangian Relaxation Method - Bat Algorithm

Volume 10, Issue 24, November 2020, Pages 13-26

10.29252/anm.2020.12767.1420

Kamyar Tolouei; Ehsan Moosavi; Amirhossein Bangian Tabrizi; Peyman Afzal; Abbas Aghajani Bazazi


Determination of Rock Fragmentation Based on Longitude Wave Velocity and Fractal Dimension

Volume 10, Issue 24, November 2020, Pages 105-117

10.29252/anm.2020.11479.1376

Morteza Baghestani; Masoud Monjezi; Alireza Yarahmadi Bafghi; Peyman Afzal


Optimization of Underground Stopes Sequence Using Mathematical Modeling; (0-1) Integer Programming

Volume 10, Issue 23, August 2020, Pages 133-143

10.29252/anm.2019.8194.1284

Farzad Sotoudeh; Mohammad Ataei; Reza Khaloo Kakaie


Uncertain Production Scheduling Optimization in Open-Pit Mines and Its Box Robust Counterpart

Volume 9, Issue 21, February 2020, Pages 9-19

10.29252/anm.2019.9426.1328

Aref Alipour; Mojtaba Mokhtarian Asl; Ali Asghar Khodaiari


Development of a Fuzzy Classification System to Evaluate the Quality of Coal Mines Roof (Case Study: Eastern Alborz Coal Mines)

Volume 9, Issue 20, October 2019, Pages 1-13

10.29252/anm.2019.1240

Reza Mikaeil; Mohammad Ataei; Mohammad Javanshir Giv; Saleh Ghadernejad; Amir Jafarpour


Evaluation of the Mining Projects under Price Uncertainty in Two – Element Deposits Using Binomial Tree Method

Volume 9, Issue 20, October 2019, Pages 43-51

10.29252/anm.2019.7582.1260

Gholamhossein Kakha; Masoud Monjezi; Mohammad Hossein Basiri


Comparative Advantages of the Mineral Excavation in Azerbaijan-e-Gharbi Province of Iran

Volume 9, Issue 19, September 2019, Pages 127-139

10.29252/anm.2019.5407.1171

Attaollah Bahrami; Jafar Abdollahei sharif; Mohammad Javad Rahimdel; Amir Zialame


Operating Environment Based Reliability Analysis of Mining Equipment Case Study: Molybdenum-Copper Mine (Sungun Copper Mine)

Volume 9, Issue 18, May 2019, Pages 129-141

Ali Nouri Qarahasanlou; Mohammad Ataei; Reza Khalokakaie; Saied Fatoorachi; Reza Barabady