[1] PMI; 2004; “Project management body of knowledge”, Project management institute.
[2] OSPMI; 2007; “Project risk management handbook”, Second Edition, Office of project management process improvement.
[3] PMBOK; 2004; “A Guide to project management body of knowledge”, Project management institute.
[4] Steffen, O.K.H; 2007; “Mine planning – its relationship to risk management”, ACG newsletter, Vol. 29, pp. 1-6.
[5] Joy, J; 2004; “Occupational safety risk management in Australian mining”, Occupational medicine, Vol. 54, No. 5, PP. 311–315.
[6] Arendsb, G; et al.; 2004; “Risk budget management in progressing underground works”, Tunnelling and Underground Space Technology, vol. 19, Issue 1, pp. 29–33.
[7] Duzgun, H.S.B; Einstein, HH; 2004; “Assessment and management of roof fall risks in underground coal mines”, Safety Science, vol. 42, Issue 1, PP. 23-41.
[8] Heuberger, R; 2005; “Risk analysis in the mining industry”, The Journal of South African Institute of Mining and Metallurgy, PP. 75-80.
[9] Soons, C.J; Bosch, J.W; Arends, G; Gelder, P.H.A.J.M; 2006; “Framework of a quantitative risk analysis for the fire safety in metro systems”, Tunneling and Underground Space Technology, Vol. 21, Issue 3-4, pp. 6.
[10] Reilly, J.J; 2006; “Cost Estimating, Probable Cost, Risk Identification and Risk Management for Infrastructure Projects”, Proceedings American Public Transportation (APTA) Conference.
[11] Reilly, J.J; Parker, H.W; 2007; “Benefits and Life-Cycle Costs of Underground Projects”, Proceedings, AITES-ITA World Tunnel Congress, Prague, Vol. 1, pp.679–684.
[12] Parker, H.W; Reilly, J; 2008; “Risk and Life Cycle Costs and Benefits for Underground Projects”, Proceedings, North American Tunneling Conference, San Francisco, SME, Denver.
[13] Evans, R; Brereton, D; Joy, J; 2007; “Risk assessment as a tool to explore sustainable development issues: lessons from the Australian coal industry”, Int. J. Risk Assessment and Management, Vol. 7, No. 5, pp. 607-619.
[14] Wang, L.G; Miao, X.X; Dong, X; Wu, Y; 2008; “Application of quantification theory in risk assessment of mine flooding”, Journal of China University of Mining and Technology, Vol.18, Issue 1 , pp. 38-41.
[15] Fuentes, J.E; George, T; Whittikar, J; 2009; “Measuring and mitigating risk in mining operations”, III International Conference on Mining Innovation, 2-9.
[16] Ataee-pour, M; Dehghani, H; 2010; “The Effect of Risk in Mine Planning State”, 20 Iranian Global Congress on Mining.
]17[ صیادی، احمد رضا؛ حیاتی، محمد؛ آذر، عادل؛ (1390)؛ “ارزیابی و رتبه بندی ریسک در پروژههای تونلسازی با استفاده از روش تخصیص خطی”، مجله بینالمللی علوم مهندسی، جلد 22، شماره 1، صفحه 38-28.
]18[صیادی، احمد رضا؛ منجزی، مسعود؛ (1390)؛ “ارزیابی، رتبه بندی و خوشه بندی ریسک در عملیات تونلسازی با استفاده از روش ELECTER”، مجله مهندسی معدن، جلد 22، شماره 11، صفحه 69-57.
]19[صیادی، احمد رضا؛ منجزی، مسعود؛ حیاتی، محمد؛ (1390)؛ “مدیریت ساخت تونل با استفاده از روش تکنیکهای MADM”، مجله مدیریت صنعتی دانشگاه تهران، دوره سوم شماره 7، صفحه 116-99.
[20] Sayadi, A.R; Monjezi, M; Hayati, M; 2011; “Landslide Risk Assessment Using Fuzzy Topsiss Method”, Indian Landslide, Vol.1, No.4, pp.35-38.
]21[صیادی، احمد رضا؛ منجزی، مسعود؛ وحیدی، مهدی؛ (1386)؛ ارزیابی اقتصادی و تحلیل ریسک معدن مس سونگون، نشریه علمی پژوهشی مهندسی معدن، دوره دوم، شماره سوم، صفحه 39-21.
[22] Sayadi, A.R; Monjezi, M; Vahidi, M; 2006; “Sensitivity and risk analysis of critical technico-economical variables of sungun copper mine”, Journal of mines, metals & fuels, Vol.55, No. 1-2, pp.11-18.
[23] Chapman, C.B; Ward, S.C; 2003; “Project Risk Management: Processes, Techniques and Insights”, Second edition, John Wiley, Chichester, UK.
[24] Pipattanapiwong, J; 2004; “Development of Multi-party Risk and Uncertainty Management Process for an Infrastructure Project”, PhD Thesis, Kochi University of Technology.
[25] Larry, E.S; Jesse, R.R; Thompson, R.L; Iacovou, C.L; 2003; “Determining attribute weights using mathematical programming”, Omega: The International Journal of Management Science, Vol. 31,No.6, pp. 423–437.
[26] Pimerol, J.C; Romero, S.B; 2000; “Multi criteria decision in management: principles and practice”, Kluwer Academic Publisher.
]27[ اطمینانی مقدم، فرنوش؛ (1384)؛ “بررسی تحلیلی شناسایی ریسکهای معمول در پروژه های ساختمانی”، دومین کنفرانس بینالمللی مدیریت پروژه، تهران.
[29] Hillson, D. A., 2002; “Using the Risk Breakdown Structure (RBS) to Understand Risks”, Proceedings of the 33rd Annual Project Management Institute Seminars & Symposium, San Antonio, USA.
[30] Chinbat, U; Takakuwa, S; 2009; “Using simulation analysis for mining project risk management”, proceedings of the 2009 winter simulation conference, pp. 2612-2623.
[31] McDermott, R. E; Mikulak, R.J; Beauregard, M.R; 1996; “The basics of FMEA”, Second edition, Quality Resources, New York.
]32[قدسی پور، سید حسن؛ (1381)؛ مباحثی در تصمیم گیری چند معیاره ، انتشارات دانشگاه امیر کبیر، تهران، چاپ سوم.
[33] Saaty T; Alexander J; 1981; “Thinking with models: Mathematical models in the physical, biological, and social sciences”, Pergamon Press, Oxford and New York.
]34[ اصغرپور، محمدجواد؛ (1390)؛ تصمیمگیریهای چندمعیاره، انتشارات دانشگاه تهران، تهران، چاپ نهم.
]35[ عطایی، محمد؛ (1389)؛ تصمیم گیری چند معیاره فازی، انتشارات دانشگاه صنعتی شاهرود؛ تهران، چاپ اول.
]36[ آذر، عادل؛ رجب زاده، علی؛ (1387)؛ تصمیمگیری کاربردی (رویکرد MADM) ، نشر نگاه دانش؛ تهران، چاپ 3.
]37[ سازمان توسعه و نوسازی معادن و صنایع معدنی ایران؛ (1385)؛ گزارش امکانسنجی معدن طلای زرشوران.